Butch and Linda Feulner Build

To celebrate their 50th wedding anniversary, Butch and Linda Feulner are sponsoring a Habitat home for Kendra J. Kendra’s home will be built in the Jacobsville neighborhood. Thank you to Butch and Linda for making Habitat a part of your celebration!

Meet the Future Homeowner, Kendra J.

“It’s a relief to own a home. I’ll have financial freedom, stability, and independence. It’s a really good feeling.”

– Kendra J.

Read Kendra’s Story

Donation Goal
0%
Volunteer Goal
0%
Phase Progress
0%
  • Phase 1

    Homesite Selection

    Homeowner selects homesite from available Habitat lots. Homeowners are paired with their sponsor.

  • Phase 2

    Groundbreaking

    During the groundbreaking, the foundation is completed, and the block work is laid.

  • Phase 3

    Crawl Space and Floor System

    Volunteers install moisture barrier and insulation in crawl space.

    For the floor system, the floor joists are installed, more foam insulation is filled in between joists and band boards, and OSB board is laid for the flooring. Black paper is laid on the two porches to help maintain the longevity of the home.

        

  • Phase 4

    Walls

    Wall Prep: Volunteers build wall components  (king jack studs, California corners, headers, etc.) and layout 2 x 4 location on the top and bottom plates of each wall.

    Wall Building: Wall components are nailed together on top and bottom plates with 2 x 4s. This is completed for both interior and exterior walls.

    Wall Raising: Volunteers raise, level, and secure the walls. Exterior walls go up first, followed by the interior.

    Trusses: OSB boards are laid on first and last trusses to attach the siding.

        

  • Phase 5

    Doors and Windows

    Volunteers install windows and doors.

  • Phase 6

    Internal Mechanics

    Plumbing, electric, insulation, and dry wall are installed.

  • Phase 7

    Pre-insulation

    Pre-insulation is installed on exterior walls, doors, windows, ceiling, and floors. Baffles are put in to circulate airflow.

  • Phase 8

    Painting

    Volunteers paint the walls and ceiling. Corners and edges are cut out first, then roll the ceilings, and then the walls.

    We will be painting July 13 please click here to sign up

  • Phase 9

    Cabinets and Appliances

    Cabinets and countertops installed.

    Later, refrigerator, stove, microwave, dishwasher, garbage disposal, and washer & dryer are installed.

  • Phase 10

    Trim Work and Flooring

    Trim around windows and doors are completed. Interior doors are also installed. Vinyl and carpet are laid.

  • Phase 11

    Exterior Concrete

    Exterior concrete parking pad and sidewalks are poured.

  • Phase 12

    Yard Prep

    The yard is prepared for grass seed sewing.

  • Phase 13

    Dedication

    Homeowner and community members come together to bless and dedicate the home, complete with a ribbon cutting.